More Space Without Leaving the Lot
Home Additions and ADUs in Millcreek for compact-footprint homes that need more living area
A large share of homes in Millcreek and the surrounding Salt Lake Valley were built with single-level layouts and modest square footage, often in the 1950s through 1970s, when compact construction on smaller lots was standard. Adding a room, an attached garage conversion, or a backyard ADU on those properties is frequently more practical than relocating, and it is structurally feasible because the existing framing can be tied into directly. RSG Builders, LLC builds home additions and accessory dwelling units in Millcreek, managing design, permitting, and construction under one contract from the first consultation through final inspection.
Every project begins with a design review and consultation, followed by drafting and permit applications before construction pricing is finalized. RSG Builders self-performs framing and structural work, which is the phase where the addition connects to the existing house and where errors in beam sizing or bearing wall transitions create problems that are expensive to correct later. Licensed subcontractors handle mechanical, electrical, and plumbing, and each inspection is scheduled and passed before the next trade begins work.
Arrange an initial consultation with RSG Builders to review the existing structure and discuss what an addition or ADU would require on your specific lot.
How an Addition Is Structured and Sequenced
The sequence on an addition matters more than on a standalone new build because you are tying new framing into an existing structure that may have settled, been modified, or been built before current code requirements were in place. Before any framing begins, the connection points between the new and existing structure are assessed for bearing capacity, the roof or floor tie-in is planned, and the foundation extension is designed to match the existing system or improve on it where code requires.
Once framing is complete and inspected, the interior trades follow in a specific order dictated by inspection requirements: rough framing, then mechanical and electrical rough-in, then insulation, then drywall. When that sequence is followed correctly, you end up with a finished addition where the transitions between old and new are not visible in the walls or ceilings, and the electrical and plumbing are accessible for future service without disturbing finish surfaces.
ADUs carry additional permitting steps in Millcreek because they establish a separate dwelling unit with its own utility connections and occupancy requirements. RSG Builders handles those permit applications as part of the contract, including coordinating with the relevant utility providers and scheduling the occupancy inspection at project closeout.

The questions below address the structural and sequencing decisions that affect how a home addition or ADU comes together, particularly on the kinds of single-level homes common in the Millcreek area.
How does the framing of an addition connect to the existing house structure?
The connection depends on whether the addition shares a roof line or steps down, and whether the existing wall being opened is load-bearing; a load-bearing wall requires a properly sized header and post before the opening can be made.
What has to be confirmed about the existing foundation before an addition is framed?
The existing footing depth and width are checked to determine whether the foundation can carry additional load at the tie-in point, because additions that bear on an undersized footing will settle unevenly at the joint between old and new.
Why are inspections scheduled between trades rather than at the end?
Each inspection creates a verified record that the previous work meets code before it is covered by the next system, which is required by the permit and protects you if the property is appraised or sold.
How is an ADU different from a standard addition in terms of permitting?
An ADU requires a separate address assignment, its own utility service connections, and an occupancy inspection that confirms it functions as an independent dwelling unit, which adds steps that must be coordinated with the municipality and utility providers.
What does finished framing in a quality addition look like before drywall goes up?
Studs are plumb and at consistent spacing, headers are sized for the span, blocking is installed at fixture locations, and the transition from old to new framing has no gaps or steps that would telegraph through the finished wall surface.
Answers About How Addition and ADU Projects Work
RSG Builders also builds home additions and ADUs in Salt Lake City, Murray, Holladay, West Valley City, and Sandy. Call (801) 599-3235 to speak with RSG Builders about your project and get a detailed estimate based on your property's specific conditions.