Framing That Reads the Existing Structure First
Custom framing and rough carpentry in Millcreek for load-bearing wall removals, additions, and renovation work in houses built decades ago
Framing a new wall in a house built last year and opening a load-bearing wall in a house built in the 1960s are categorically different problems. RSG Builders, LLC provides custom framing and rough carpentry in Millcreek with framing as the company's core trade—the owner began his career as a framer, and the work is performed by RSG's own crew rather than handed to a subcontractor. Renovations in this part of the Salt Lake valley frequently involve houses where the original framing has to be fully understood before anything is removed, because load paths in older residential construction don't always follow the patterns a newer builder would expect.
Before cutting begins on any wall removal or opening, RSG confirms the existing structure and traces the load path from the roof or floor above down through the framing to the foundation. Temporary shoring is installed where needed to carry the load during the transition. Layout is checked against the plans before lumber goes up, and the completed framing is inspected before insulation and drywall are applied, so the structural work is reviewed while it's still visible.
Schedule a structural review of your existing framing before committing to a floor plan change or wall removal.
How Framing Addresses Load-Bearing Conditions
The header over a new opening carries the load that the wall below it used to transfer to the foundation. Header size is determined by the span of the opening and the load above it—a header sized for a door opening in a non-load-bearing partition wall is not appropriate for a wide opening in a wall that carries floor or roof load. RSG sizes headers to the structural conditions of the specific opening rather than to a default, and temporary shoring remains in place until the new header and its support posts are fully installed and bearing correctly.
Once the framing work is complete and inspected, what the client sees is the new opening—plumb, square, and sized to the plan—with the load above it transferring cleanly through the new header and posts to the foundation below. In houses in Millcreek and West Valley City where load-bearing walls have been in place for decades, the framing condition on either side of the old wall often reveals what the house has been doing structurally over time: settling, lateral shifts, and modifications made by previous owners that weren't part of the original design. RSG Builders documents those conditions as part of the pre-cut assessment so the new work accounts for them.
New construction framing and addition framing follow the same principle: layout is verified against the plans before materials go up, and the sequence of framing—floor system, walls, then roof or floor above—is followed in order so each stage can be inspected and confirmed before the next begins. RSG's work covers residential new construction, additions, and renovation framing across projects of varying scale, with the company's own carpenters performing the work on every job.

Framing and rough carpentry questions often come down to what the existing structure will allow and how changes have to be sequenced to keep the building stable throughout the work. These answers address the most common decision points.
How does RSG determine whether a wall is load-bearing before removing it?
The assessment traces the framing from the wall in question up through the floor or roof structure above and down to the foundation below. Load indicators include doubled top plates, posts directly above or below, and walls that run perpendicular to floor joists. RSG conducts this evaluation before any cutting plan is finalized.
What is temporary shoring and when is it required?
Temporary shoring is a structural support system installed to carry the load that a wall is currently transferring while that wall is removed and the permanent header is put in place. It is required any time a load-bearing wall is opened, and it stays in place until the new header and its bearing posts are fully installed and the load path is re-established.
How are headers sized for new wall openings in older residential construction?
Header sizing depends on the span of the opening, the load from the floors or roof above, and the lumber species used. In houses from the mid-century in Millcreek and surrounding areas, the existing framing dimensions were often set to standards that differ from current code, so the new header is sized to current requirements for the actual span and load—not matched to what was there before.
What happens during the framing inspection before walls are closed?
A building inspector reviews the completed rough framing to confirm that headers are properly sized and bearing, that the load path from above is correctly transferred through the new structure, and that the framing meets the applicable residential building code. RSG schedules this inspection before insulation or drywall is applied so the structural work can be fully evaluated.
How does RSG handle framing conditions that differ from the original plans once work is underway?
When the existing structure reveals conditions that weren't visible during the initial assessment—previous modifications, unexpected framing configurations, or materials that differ from what the plans assumed—RSG documents the condition, discusses the options with the homeowner, and adjusts the approach before proceeding. Work does not continue past a structural discrepancy without a resolved plan for addressing it.
Questions Before Starting Your Project
RSG Builders, LLC also performs
custom framing and rough carpentry in Holladay, Salt Lake City, Murray, West Valley City, and Sandy. Call (801) 599-3235 to arrange a structural review and get a framing plan drawn for your project.